From Jonathan Dockrell, CEO & Co-Founder
The following is a personal take from our CEO on a corner of the drone industry that doesn't get the regulatory headlines but matters just as much to anyone paying for the work. We publish these because the standards that separate real survey-grade data from a nice looking map rarely get explained in plain language, and clients end up paying for the difference either way.
The one-paragraph version
Part 107 is the legal requirement to fly commercially in the United States. It's not a survey credential, and it never claimed to be. The real technical bar for inspection and surveying work comes from two places: the ASPRS Positional Accuracy Standards for Digital Geospatial Data, now in Edition 2, Version 2, and professional certification through ASPRS itself, which has tiers ranging from a technologist credential up to a scientist-level certification requiring work experience and a real exam. Most of the market doesn't draw this distinction. A pilot with a Part 107 certificate and a drone with a nice camera can legally fly the exact same job as a certified mapping scientist, and the deliverable can look identical in a PDF. Whether it holds up under scrutiny is a different question entirely, and it's the question this piece is about.
What Part 107 certifies, and what it doesn't
Part 107 confirms you understand airspace classifications, weather minimums, and basic operating rules well enough to pass a test and not endanger people or aircraft. That's genuinely important and nobody should fly commercially without it. What it says nothing about is whether you understand photogrammetry, how ground control works, what checkpoint density a given accuracy class requires, or how to catch a systematic error before it ships in a deliverable. Those are different skill sets entirely, closer to surveying and remote sensing science than to piloting. A client hiring based on Part 107 alone is hiring for the legal right to be in the air, not for competence on the ground.
The ASPRS Positional Accuracy Standards, and what changed in 2024
If there's one document a serious consultant's deliverables should trace back to, it's this one. The American Society for Photogrammetry and Remote Sensing adopted Edition 2, Version 2 of its Positional Accuracy Standards for Digital Geospatial Data in June 2024. The lineage goes back further than that single date suggests. The original 1947 National Map Accuracy Standards and the 1990 ASPRS standard were both built for plotted paper maps and had nothing useful to say about lidar point clouds or drone-captured orthomosaics. ASPRS published a first digital-era edition in 2014 to start addressing that gap, then replaced it with Edition 2 in 2023, then refined that into the current Version 2 less than a year later. The point isn't that nothing happened between 1990 and now. It's that the standard is still actively being worked on by people who build this technology for a living, which is exactly what you'd want from something a consultant's deliverables are measured against.
Edition 2 made real changes, not cosmetic ones. It eliminated references to the 95 percent confidence level as an accuracy measure, introduced a new term called three-dimensional positional accuracy, removed the old pass or fail requirement for vegetated vertical accuracy in lidar data, raised the minimum required checkpoints for accuracy assessment from 20 to 30, and capped the maximum at 120 for large projects. Version 2 then added four new addenda of guidelines and best practices in 2024, bringing the total to six, with dedicated sections for mapping with lidar and mapping with UAS specifically. The scientist who chaired the ASPRS working group behind this update later published a full tutorial breaking down every change for practitioners trying to apply it. If a consultant's proposal or final report doesn't reference this standard by name, that's worth asking about directly.
"Survey grade" means nothing on its own
Here's a phrase that shows up in almost every drone surveying sales pitch and means close to nothing by itself. There's no regulatory body that defines "survey grade" as a legally enforceable term. What determines whether a drone dataset is trustworthy is the density, configuration, and quality of the ground control and checkpoints used to validate it, not a label on a spec sheet. Survey leadership at a major geospatial firm has made this point directly in industry writing: UAS accuracies are only as good as the quality, density, and configuration of the ground controls behind them. A drone that can theoretically hit centimeter-level accuracy in ideal conditions tells you nothing about whether a specific project was controlled well enough to achieve it.
A concrete story of how this goes wrong
I want to give you a real example instead of an abstract warning, because abstract warnings don't stick. A drone service provider flew a linear mapping mission over a stretch of road, roughly two thousand feet long, and set five ground control points in a straight line down the center of that road. Every automated accuracy check in the processing software came back fine. The data looked clean. What nobody caught until a professional photogrammetrist reviewed it later is that control points arranged in a straight line let the resulting surface twist around that line in ways a standard accuracy check won't flag, because the geometry of the error hides from automated validation. The client ended up bringing in outside photogrammetrists to find and fix the problem after the fact. Nothing about that failure was a piloting mistake. It was a gap in understanding what photogrammetry requires, and it's exactly the kind of error a Part 107 certificate does nothing to prevent.
The credibility gap: ASPRS certification versus Part 107
As someone who watches this space closely, I think this is the single clearest signal a client can look for. ASPRS runs a tiered certification program that's entirely separate from anything the FAA requires. At the entry point sits the Certified UAS Technologist credential, which requires three years of active experience in the specialty. Above that sits the Certified Mapping Scientist, UAS certification, which requires six years of active experience split across two areas, three years in mapping or photogrammetry and three years specifically in UAS work, plus four professional references and a written exam covering flight planning, system calibration, data processing, and quality control, with renewal every five years through continuing education. None of that is required to fly a drone commercially. All of it is required to understand whether the data that drone produces is any good.
People who've gone through this process describe the exam as genuinely demanding, covering everything from the physics of how sensors work through the mathematics underlying photogrammetry itself. Worth knowing before you lean too hard on this as a credibility marker: ASPRS's outside accreditation through the Council of Engineering and Scientific Specialty Boards covers several of its certification tracks, but not the UAS or lidar specialties specifically. That doesn't make the UAS credential meaningless, the experience and reference requirements and the exam itself are still real, but it's worth knowing the outside accreditation stamp doesn't extend to this particular track.
The ASTM standard that isn't finished yet
Here's the part of this story most people get wrong, and I want to correct it directly because I've seen it repeated in trade coverage and contract language for years. ASTM's Committee F38 covers unmanned aircraft systems broadly, things like airworthiness, flight operations, and compliance auditing. But the specific guide everyone assumes exists for drone-based facade inspection, often cited loosely as "the ASTM drone standard," has been sitting as a proposed work item since January 2016, originally filed as WK52572, and still isn't a published standard today. It lives under a different ASTM committee entirely, the one focused on building enclosure performance, not the UAS committee most people assume governs it.
What is published and enforceable right now are two standards that predate drones entirely: E2270, the practice for periodic inspection of building facades for unsafe conditions, and E3036, the guide for notating facade conditions in the field. Those set the real requirements for what a facade inspection has to document and how, regardless of whether a drone, a swing stage, or a person on a ladder gathered the imagery. The drone-specific guide is tracked in ASTM's own system today as work item WK58243, still listed under proposed new standards rather than anything approved, a decade after the original filing. If a contract or a consultant's marketing material cites a specific ASTM standard number for drone facade inspection procedures, it's worth asking them to produce it, because the document most people are gesturing toward doesn't exist in published form yet.
What a client should ask before hiring a consultant
Pull this together and the questions a client should be asking look pretty different from "do you have a drone license."
- Ask which accuracy standard the deliverable will be measured against, and expect a specific answer naming the current ASPRS Positional Accuracy Standards, not just the phrase "survey grade."
- Ask about ground control and checkpoint configuration for your specific project, not just a general claim about centimeter-level accuracy achievable under ideal conditions.
- If your project is small, the kind of thing a lot of drone surveys are, ask whether it met the standard's 30-checkpoint minimum for a full accuracy assessment. The standard itself acknowledges that many drone projects won't hit that number and provides specific reduced-checkpoint reporting language for exactly that case. A consultant who hit 30 says so plainly. One who didn't should be using that disclosure language, not quietly reporting a number as if it meets the full standard.
- Ask whether the person processing and validating the data holds an ASPRS certification, separate from whoever is physically flying the aircraft. Those can be different people, and for a complex project they often should be.
- If facade or structural inspection work is being sold against a specific ASTM standard, ask for the standard number and confirm it's published, not a proposed work item still in development.
- Ask what happens when an automated accuracy check passes but the underlying geometry is still wrong, the way it did in the straight-line ground control failure above. A consultant who's never thought about that question hasn't done enough of this work yet.
Where this intersects with critical infrastructure work
If the inspection or survey work involves a facility that falls under the FAA's restricted flight framework for critical infrastructure, the standards in this piece aren't the only thing to plan around. Getting the data right doesn't help if the flight itself wasn't authorized to happen in the first place, and the restriction process for those sites works differently from ordinary Part 107 operations. The FAA proposed a new Part 74 covering exactly this, restricting drone operation near critical infrastructure, in a May 2026 NPRM, and it's still a proposed rule, not a final one.
Further reading, from my Substack: A Sign Is the First Signal a Market Needs
Conclusion
Part 107 tells you someone is legally allowed to fly. It was never meant to tell you anything about whether the data that comes back is worth trusting, and treating it as a competency credential is where a lot of bad drone surveying data comes from. The real bar, the ASPRS accuracy standards, real professional certification, and an honest accounting of what published standards do and don't exist yet, is more work to verify than checking for a certificate number. It's also the only version of that check that protects the client paying for the work.
Related reading: Section 2209 Part 1 - what the proposed Part 74 rule would do and who it affects. Section 2209 Part 2 - sector-by-sector impact, including inspection work. Beyond Visual Line of Sight in 2026 - what operators should do before Part 108 lands.
Primary sources and industry analysis
- ASPRS, Positional Accuracy Standards for Digital Geospatial Data, Edition 2, Version 2 (2024), adopted June 24, 2024, announcement with full list of changes, amerisurv.com - ASPRS Edition 2, Version 2 announcement
- ASPRS, Certification Program, including the Certified UAS Technologist and Certified Mapping Scientist, UAS credentials, asprs.org - ASPRS Certification Program
- FAA, Small Unmanned Aircraft Systems (UAS) Regulations, Part 107, faa.gov - Part 107 overview
- ASTM International, Committee F38 on Unmanned Aircraft Systems, astm.org - Committee F38 overview and standards list
- ASTM International, Subcommittee E06.55 on Performance of Building Enclosures, current standards list confirming the published facade inspection standards and the still-pending drone-specific guide, astm.org - E06.55 jurisdiction and standards list
- Qassim Abdullah, "Overview of the ASPRS Positional Accuracy Standards for Digital Geospatial Data, Edition 2, Version 2 (2024)," Photogrammetric Engineering & Remote Sensing, Vol. 91, No. 5 (May 2025), pp. 247-255, cited for the detailed breakdown of what changed in the 2024 update and the standard's own checkpoint-count disclosure requirements, written by the scientist who led the ASPRS working group behind it, my.asprs.org - full journal article PDF
- Woolpert, republication summary of the same article as it ran concurrently in Lidar Magazine, woolpert.com - ASPRS Positional Accuracy Standards update overview
- Commercial UAV News, "Making Drone Technology Credible for Surveyors and Engineers," cited for the first-person account of ASPRS certification and the ground control failure example, commercialuavnews.com - ASPRS certification article
Disclaimer
This piece is informational and reflects ASPRS, ASTM, and FAA published standards and program materials as of October 5, 2026, the date this piece was last reviewed. It is not legal, surveying, or engineering advice. Standards and certification requirements can change, and project-specific accuracy requirements should always be confirmed against the current version of the applicable standard. If you are making real decisions about hiring a consultant or certifying deliverables, talk to a licensed surveyor or qualified professional in the relevant discipline.